Building of an exclusive multiroom apartment house (S=1200m2) in Riga
- Monolithic skeleton
- Ventilated facades
- the Covering of facades glass and ceramogranite.
- Duration of building – 10 months.



 
 
   
5-storeyed monolithic garage
In 2007 the firm, in cooperation with „WEI RED”, has constructed 5-storeyed monolithic garage with application of a method of postpressure of concrete on plates of overlapping and beams (length to 17м).



 
 
   
MEŽA CIEMS
Since 2003 “MODULORS Ltd.” has been engaged in construction project in Riga (in Mezciems). During the realization of the project it is planned to build a complex of four-storey apartment houses (project MEŽA CIEMS, developer – JSC „West East Industries”, main contractor “WEI Real Estate Development Ltd.”).



 
 
   
Private house in Jurmala
Construction of a private house in Jurmala in 2000. Project realisation time - 12 months (including complete designing of the project). The total area of the house is 360 m².


 
 
 
   
Dwelling house
Dwelling house in 4 Vidus Street, Riga. Architectural object of art nouveau built in 1909:
- Renovation of the facade in 2000.


 
 
 
   
"GUTTA Ltd"
In 1997 the following activities have been carried out in the juice production place of "GUTTA Ltd.":
- Installation of acid-resistant flooring with resistance of up to 8t/m² on the basis of reinforced concrete with the area of 623,5 m²,
- Wall lining with phosphogypsum plates on wooden structural timber product, walls' height – 9.0 m (1012.7 m²),
- Wall finishing with the filler tiles, walls' height – 2.1 m (260.3 m²),
- Painting the walls, ceilings, beams and columns with the height of 9.0 m (3553.2 m²). The following activities have been carried out in the storehouse for complete product:
- Wall plastering, walls' height – 9.0 m (1054.0 m²),
- painting the walls, ceilings, beams and columns with the height of 9.0 m (3553.0 m²),
- installation of the reinforced cement flooring (355.2 m²).
 
 
   
Riga HPS
A short list of the activities carried in the objects of Riga HPS in 1996 and 1999: - Fencing of the territory of the holding yard,
- Construction of the pass of the holding hull,
‑ Construction of oxygen and propane-butane storehouse,
- Construction of the storehouse for lubricants and fuel in the holding hull,
- The vertical planning of the territory of the holding yard,
- Painting of the facade of the main hull,
- Construction of the flooring of the holding yard from monolithic reinforced concrete with the total area of 3000 m²,
- Construction of the holding complex in the territory of the holding yard of Riga HPS, etc